• Shoe Work Order Form v5.3

    Shoe Work Order Form v5.3

    Standard Fabrication 5 Business Days
    • Account Information 
    • Order Information 
    • Today's Date
       - -
    • Requested Due Date*
       - -
    • Device 
    • Design 
    • Lift
    • Lift Options*

    • Lift Material*

    • Soling Material*

    • Rocker
    • Rocker Options*
    • Rocker Grade*
    • Standard Grade Includes:

      Adding up to 10 mm (3/8") crepe then grinding in rocker

    • Mild Grade Includes:

      Adding up to 6 mm (1/4") crepe then grinding in rocker

    • Severe Grade Includes:

      Adding up to 13 mm (1/2") crepe then grinding in rocker

    • Flare
    • Flare Location*
    • Flare Location*
    • Wedge
    • Wedge Location*
    • Wedge Location*
    • Shank
    • Shank Options*
    • Finshing 
    • Velcro Closure
    • Velcro Placement Options*

    • Speed Lace Installation
    • Resole
    • Reheel
    • Additional Instructions 
    • Guidelines
    • AOPS Billing 
    • Should be Empty: