BSA HFC VIC - Job Completion Report - DinVision

BSA HFC VIC - Job Completion Report - DinVision

PTConnect Form Preview
BSA HFC VIC - Job Completion Report - DinVision
  • BSA HFC Job Completion Report - DINVISION

  •  -  - Pick a Date
  • ------------------------------------------------------------------------------------------
  • Upload photo of meter readings
  • Upload photo of meter readings
  • *****! PLEASE INCLUDE WHITEBOARD IN ALL PHOTOS*****

  • Photo of property with visible house number.

  • Upload Photos
  • Photo of intended PCD install location showing surroundings

  • Upload Photos
  • Installed PCD (open, showing connector & isolator)

  • Upload Photos
  • Photo of cable connected to Tap, showing tag.

  • Upload Photos
  • Photo of new LIC entry depth in pit (showing tape measure)

  • Upload Photos
  • Photo of trenching showing distance (e.g. on Whiteboard)

  • Upload Photos
  • Photo of boring with Grundomat showing distance

  • Upload Photos
  • Photo of breakout (Concrete, Asphalt, Pebblecrete etc.)

  • Upload Photos
  • Photos of reinstatement (Concrete, Asphalt, Pebblecrete etc.)

  • Upload Photos
  • Photo of installed Y-connector

    51-02-00-06
  • Upload Photos
  • Photo of "Dig Down" LIC Repair

    51-02-00-05
  • Upload Photos
  • Upload Photos
  • Should be Empty: