• solarcity PV array and battery commissioning sheet

  • Date of testing
     / /
    • Continuity 
    • Earth continuity 1 - earth busbar to earth rod (MEN link removed) ohms (<0.5).

    • Earth continuity 2 - Main earth conductor to array frame ohms (<0.5).

    • Polarity check and PV open circuit voltage 
    • Insulation resistance measurements 
    • )

    • Image field 35
    • System operation 
    •    

    • PV array switch-disconnector operating currently under load
    • Sunlight/irradiance at time of testing
    • Battery setup check 
    • Confirm that normal house loads are not supplied during backup mode
    • Confirm backup loads are supplied during backup mode?
    • Terminations and CT installation 
    • All terminations in SolarZero switchboard checked
    • All terminations inside cabinet checked
    • Confirmed correct orientation of EZ Meter Mains CT? (1)
    • Commissioning connectivity 
    • EMU serial number supplied to solarcity
    • Engineering support confirmed system online
    • System locked off for inspection 
    • D.C. energy sources locked off for inspection (2)
    • Battery BMS is turned off (3)
    • EMU left powered on and connected to internet (4)
    • Clear
    • Image field 60
    • Should be Empty:
Select theme:
  • Default
  • Blue
  • Red
  • Brown
  • Green
  • Black
  • Pink
  • Dark Blue
  • Purple