• Adani Krishnapatnam Port Container Terminal

    Adani Krishnapatnam Port Container Terminal

    Safety begins with ME
  • RTGC Pre - Operational checklist

  • Date*
     - -
    2 digit day, 2 digit month, 4 digit year :
  • Ground level*
    Rows
  • Engine level*
    Rows
  • Spreader level*
    Rows
  • Cabin level (Before control ON)*
    Rows
  • Operational check (After control ON)*
    Rows
  • Note: ANY DAMAGE / FAULTS / TO BE REPORTED IMMEDIATELY TO SHIFT MANAGER AND ETS

  • Signature*
  • Should be Empty: