5. Have the below annotations been completed?
- Ceiling height (in multiple points in room and below beams)
- Any work still to be completed (ie plastering, walls to be built)
- Any walls, floor and ceiling not level
- Wall construction and internal/external walls
- Specify boxings: soil stack, beam, column, pipe boxing
- Door height and architrave detail
- Window elevation, height, sill depth and swing direction
- Cornice, skirting and decorative details