HVAC Commissioning Checklist
Date
-
Month
-
Day
Year
Date
Job #
Name
First Name
Last Name
Location
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
System Type
Split System
RAC
Package System Stage 1
Package System Stage 2
AC Number
Multi meter Make/Model
Multi meter Serial No.
Multi meter Calibration Date
-
Month
-
Day
Year
Date
Insulation Tester Make / Model
Insulation Tester Serial No
Insulation Tester Calibration Date
-
Month
-
Day
Year
Date
Unit Manufacturer
Outdoor Model
Outdoor Serial
Indoor Model
Indoor Serial
Unit Operational
Yes
No
Electrical Testing
Results
Pass/Fail
Names
Insulation Test From Isolator to Condensor Unit
Pass
Fail
Test Earth Continuity from Condenser unit to Main Earth Incomer
Pass
Fail
Test Earth Continuity from Evaporator unit to Main Earth Incomer
Pass
Fail
Record Circuit Breaker Size
Pass
Fail
Circuit Cable size
Pass
Fail
Label the Isolator with Isolation point
Pass
Fail
Recorded Results
Results
Pass/Fail/NA
Insulation Test From Isolator to Condensor Unit
Pass
Fail
Test Earth Continuity from Condenser unit to Main Earth Incomer
Pass
Fail
Test Earth Continuity from Evaporator unit to Main Earth Incomer
Pass
Fail
Record Circuit Breaker Size
Pass
Fail
Circuit Cable size
Pass
Fail
Label the Isolator with Isolation point
Pass
Fail
Recorded Temperatures
Results
Pass/Fail/NA
Temperature of Air On Coil
Pass
Fail
Temperature of Air Off Coil
Pass
Fail
Room Temp
Pass
Fail
Suction Pressure
Pass
Fail
Discharge Pressure
Pass
Fail
Outside Ambient Temperature
Pass
Fail
Further Information
Upload Photo of Indoor unit Nameplate
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Upload Photo of Installed Indoor unit with AC no.
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Upload Photo of Installed Indoor unit with AC no.
Browse Files
Drag and drop files here
Choose a file
Cancel
of
License Number
Signature
Clear
Submit
Should be Empty: