Crane Inspection Checklist
Crane Serial Number
Work location
Street Address
Street Address Line 2
City
State / Province
Postal / Zip Code
Conducted date
-
Month
-
Day
Year
Date
Upload a proof file of the work permit
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Items
Rows
Good condition
Not in a good condition
Needs repair
Notes
Hoist hook - check for cracks, deformation
1
2
3
Safety latch on hoist hook
4
5
6
Sheaves, drums, Roope reeving
7
8
9
Collector systems, conductors
10
11
12
controllers - contacts, springs, brushes
13
14
15
Brakes-bands, linings, wheels, bridge brakes
16
17
18
Holding brakes - hoist
19
20
21
Trolley brakes - cab-attached
22
23
24
Hydraulic and air systems
25
26
27
Lubrication lines, fittings, pumps
28
29
30
Wheels - flange condition
31
32
33
Bumper stops and rope attached
34
35
36
Rail sweeps
37
38
39
Guards - couplings, gears in place
40
41
42
Limit switch - test rope and connections
43
44
45
Motors
46
47
48
Girders and structural members
49
50
51
Lights and supports
52
53
54
Access stairs, ladders, platform, landings
55
56
57
test manual controllers in a cab
58
59
60
Warning device
61
62
63
Running lights
64
65
66
Indicators - load, wind, angle
67
68
69
Radio control system
70
71
72
Housekeeping - loose items, debris, windows
73
74
75
Pre-operation
Rows
Compliant
Non-compliant
N/A
Crane is registered and permitted to be used in operations.
76
77
78
An operator is in good condition and is competent to perform the work.
79
80
81
Operating and emergency controls are in place.
82
83
84
Wire ropes are free from damage.
85
86
87
The brakes are in a good condition.
88
89
90
Safety switches and interlocks, including limiting and indicating devices were properly installed.
91
92
93
The structure has undergone visual inspection.
94
95
96
Loading capacity is suitable for materials to be lifted.
97
98
99
Workplace condition is free from hazards.
100
101
102
Lifting components have all required markings.
103
104
105
Away from overhead electrical lines.
106
107
108
Activities are supervised by a competent person.
109
110
111
Components are assembled in the correct sequence.
112
113
114
Edge protection systems are in place.
115
116
117
Travel restraint systems are in place.
118
119
120
Fall-arrest harness systems are in place.
121
122
123
Proper PPE is worn by workers.
124
125
126
Work In-Progress
Rows
Compliant
Non-compliant
N/A
Radio communication, including dedicated radio frequency, equipment checks, clear and constant-talk communication, and procedures for loss of signal were implemented.
127
128
129
Proper hand signaling is used.
130
131
132
Crane has load indicating device for overloading.
133
134
135
Crane has a motion indicator to avoid moving outside the radius.
136
137
138
Lifting gear is of adequate capacity, in good condition, and marked with relevant information.
139
140
141
Access to the crane cabin is safe.
142
143
144
Post job
Rows
Compliant
Non-compliant
N/A
Crane is secured to prevent unauthorized use before leaving.
145
146
147
Loads were removed from the hook.
148
149
150
The hook was raised to a safe position.
151
152
153
Powered motions are all disabled.
154
155
156
Keys are removed from a crane.
157
158
159
Crane boom is left to the weathervane where there is no risk of the boom contacting other structures.
160
161
162
Operator's cabin is locked.
163
164
165
Machine desk access is restricted.
166
167
168
Any comments
Inspector Name
First Name
Last Name
Inspector Contact Number
Please enter a valid phone number.
Format: (000) 000-0000.
Inspector Signature
Submit
Should be Empty: