Preventive Maintenance Checklist
Location
Please Select
A
B
C
D
E
F
G
If other location, please state
Date
-
Month
-
Day
Year
Date
Time Start
Hour Minutes
AM
PM
AM/PM Option
Time End
Hour Minutes
AM
PM
AM/PM Option
Functionality Checklist
Good
Problem
N/A
Bin Lifter functionality and structure
1
2
3
Lower / upper Ram functionality and structure
4
5
6
Hopper Door functionality and structure
7
8
9
Discharge Door functionality and structure
10
11
12
Internal Flushing working?
13
14
15
Discharge Door Flushing working?
16
17
18
Ozone Generator working?
19
20
21
Ultrasonic Pest Repeller working?
22
23
24
Drainage functionality and structure
25
26
27
Beacon Light working?
28
29
30
Limit switch good condition?
31
32
33
Discharge buttons working?
34
35
36
E-stop button working?
37
38
39
Smart System
Good
Problem
N/A
Screen working?
40
41
42
Control Box working?
43
44
45
Camera working?
46
47
48
Load Cell working?
49
50
51
Internet working?
52
53
54
Control Box if there is no ingress of water?
55
56
57
Hydraulic Parts
Good
Problem
N/A
Hydraulic Fitting any leakage?
58
59
60
Hydraulic Power Pack working?
61
62
63
Hydraulic Oil Level enough?
64
65
66
Tightening the suction fittings to avoid the "crackle" sound caused by entering the pump suction line.
67
68
69
Removal of filter and cleaning of filter. Care should be taken that the filter element is not torn while cleaning.
70
71
72
Replace hydraulic oil in the power unit after cleaning the reservoir thoroughly.
73
74
75
Equipment structure and Cleanliness
Good
Problem
N/A
Discharge Door Side Channel Clean?
76
77
78
Compartment behind Ramp Washed & Cleaned?
79
80
81
Overall body in good shape?
82
83
84
No Rusty / Corrosion?
85
86
87
Nylon plate good condition?
88
89
90
Lubricate guidance tracks and hinges with grease
91
92
93
Any other remarks?
Parts has been replaced during the job
Image Upload
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Signature by Customer Representative
Name
First Name
Last Name
Position
Submit Form
Should be Empty: