Electrical Rough-In Inspection Checklist
Complete this checklist to document and evaluate the electrical rough-in stage of your project.
Project Name / Site Address
*
Inspector Name
*
First Name
Last Name
Inspection Date
*
-
Month
-
Day
Year
Date
Inspection Type
*
Please Select
Initial Rough-In
Follow-Up
Final Rough-In
Electrical Rough-In Checklist
*
Rows
Pass
Fail
Needs Attention
Panel installation and labeling
1
2
3
Conduit/cable routing and support
4
5
6
Box installation and fill
7
8
9
Grounding and bonding
10
11
12
Wire size and type
13
14
15
Device box locations
16
17
18
GFCI/AFCI protection
19
20
21
Nail plate protection
22
23
24
Smoke/CO detector rough-ins
25
26
27
Low voltage/pre-wire systems
28
29
30
Are all required permits posted and accessible?
*
Yes
No
Is the work area clear of debris and accessible for inspection?
*
Yes
No
General Comments or Additional Notes
Inspector Signature
*
Submit Inspection
Submit Inspection
Should be Empty: