Vacuum Pressure Test Checklist
Record and verify all steps and results of the vacuum pressure test procedure.
Test Date and Time
*
-
Month
-
Day
Year
Date
Hour Minutes
AM
PM
AM/PM Option
Operator Name
*
First Name
Last Name
Equipment ID or Serial Number
*
Location of Test
*
Environmental Conditions (e.g., ambient temperature, humidity)
Checklist: Please indicate the status of each test step below.
*
Rows
Pass
Fail
N/A
Visual inspection of equipment
1
2
3
All connections securely tightened
4
5
6
Vacuum pump operational check
7
8
9
Vacuum gauge zeroed before test
10
11
12
System evacuated to target vacuum
13
14
15
Hold period at target vacuum completed
16
17
18
Monitored for leaks during hold period
19
20
21
System returned to atmospheric pressure
22
23
24
Initial Pressure Reading (before test) [in mbar or psi]
*
Target Vacuum Level [in mbar or psi]
*
Final Pressure Reading (after hold period) [in mbar or psi]
*
Did the system pass the vacuum pressure test?
*
Pass
Fail
Additional Remarks or Observations
Submit Checklist
Should be Empty: