SCADA Site Survey Form
Use this form to share the information needed to plan and conduct a SCADA site survey.
Site and Contact Information
Site Name
*
Site Address or Location Description
*
Primary Contact Name
*
Primary Contact Job Title / Role
Phone Number
*
Please enter a valid phone number.
Format: (000) 000-0000.
Email Address
*
example@example.com
Preferred Contact Method
Phone
Email
Either
Site Overview and Operational Context
Site type
*
Water/Wastewater
Oil and Gas
Manufacturing
Energy/Power
Building/Facility Automation
Utility
Other
Brief site description
*
Number of operating locations/areas involved in this survey
*
Current operational schedule or hours
Existing SCADA / PLC Environment
Is SCADA currently installed?
*
Yes
No
Current SCADA vendor/platform
PLC/RTU present?
*
Yes
No
Unknown
PLC/RTU manufacturers or models
Estimated number of controlled assets or remote sites
Main equipment categories
Rows
Equipment Type
Quantity
Condition/Status
SCADA Server
1
2
HMI/Operator Workstation
3
4
PLC
5
6
RTU
7
8
Network Switch/Router
9
10
IO Modules
11
12
Telemetry Radio
13
14
Other
15
16
Communications and Network Details
Communication Methods in Use
*
Ethernet
Fiber
Serial
Radio
Cellular
Microwave
Other
Network Topology Description
Available Internet/WAN Connectivity
*
None
Limited
Reliable
Unknown
Remote Access Method (if any)
Cybersecurity or Segmentation Concerns Noted
Power, Environment, and Physical Conditions
Available power sources for control equipment
*
AC mains
DC power supply
Battery backup
Solar
Generator
Other
UPS or generator backup present
*
Yes
No
Unknown
Environmental conditions impacting equipment
Dust
Heat
Humidity
Vibration
Corrosive atmosphere
Outdoor exposure
Hazardous area
Other
Equipment room or cabinet locations
Known space or mounting constraints
Access, Safety, and Survey Scope
Site access restrictions
Required safety training or site check-in procedures
Preferred survey date and time window
 -
Month
 -
Day
Year
Date
Hour Minutes
AM
PM
AM/PM Option
Survey objectives
Baseline assessment
Upgrade planning
Troubleshooting
Expansion
Documentation
Other
Priority areas to inspect
Special instructions for the survey team
Submit Survey Details
Should be Empty: