Coating Rework Inspection Checklist
Use this form to record and verify coating rework inspection results for an item, asset, or job.
Inspection Details
Inspection Date
*
 -
Month
 -
Day
Year
Date
Inspector Name
*
First Name
Middle Name
Last Name
Inspection ID / Reference
*
Site / Location
*
Equipment / Item Name or Asset ID
*
Original Coating System / Coating Type
*
Please Select
Epoxy
Polyurethane
Zinc-Rich Primer
Powder Coating
Liquid Coating
Other
Rework / Recoat Date
 -
Month
 -
Day
Year
Date
Lot / Batch / Work Order Reference
Rework Inspection Checklist
Surface preparation verified
*
Yes
No
Cleanliness verified
*
Yes
No
Dry film thickness within specification
*
Yes
No
Coverage complete
*
Yes
No
Adhesion acceptable
*
Yes
No
Curing/drying acceptable
*
Yes
No
Visual defects present
Runs/Sags
Pinholes
Blistering
Peeling
Contamination
Uneven Coverage
Overspray
Color Mismatch
Other
Overall inspection status
*
Pass
Fail
Conditional Pass
Corrective Action and Disposition
Corrective action required
*
Yes
No
Rework instructions or notes
Responsible person or team
Final disposition
*
Please Select
Accepted
Rework required
Rejected
Inspector comments or remarks
Submit Inspection
Should be Empty: