Concrete Footing Inspection Checklist
Complete this checklist to inspect concrete footings and record all inspection results. Use this form to evaluate footing location, dimensions, excavation, reinforcement, formwork, concrete placement readiness, curing, and final approval notes.
Project Name
*
Inspection Date
*
 -
Month
 -
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Footing Location Marked and Approved
*
Yes
No
N/A
Footing Dimensions (Length, Width, Depth) Verified
*
Correct as per drawings
Minor deviation
Major deviation
N/A
Excavation Quality
*
Rows
Satisfactory
Needs Correction
N/A
Depth as per design
1
2
3
Base level and cleanliness
4
5
6
Side wall stability
7
8
9
Reinforcement Placement
*
Rows
Compliant
Non-Compliant
N/A
Bar size and spacing
10
11
12
Bar cleanliness (free of mud/oil)
13
14
15
Proper supports/chairs used
16
17
18
Correct lap and cover
19
20
21
Formwork Inspection
*
Rows
Acceptable
Needs Adjustment
N/A
Material condition
22
23
24
Alignment and dimensions
25
26
27
Bracing and supports
28
29
30
Clean and free of debris
31
32
33
Ready for Concrete Placement?
*
Yes
No
Pending Corrections
Curing Measures Planned and Materials Available
*
Yes
No
N/A
Inspector Comments / Additional Notes
Final Inspection Status
*
Approved
Approved with Conditions
Not Approved
Submit
Should be Empty: