Armored Cable Termination Inspection Checklist
Complete this checklist to document the inspection of armored cable terminations. Ensure all sections are accurately filled for compliance and safety records.
Job/Site Name or Number
*
Inspector Name
*
Date and Time of Inspection
*
-
Month
-
Day
Year
Date
Hour Minutes
AM
PM
AM/PM Option
Cable Identification Number/Label
*
Termination Location
*
Visual Condition of Cable and Termination
*
No visible damage or defects
Minor cosmetic issues
Significant damage or deterioration
Termination Quality
*
Correct and secure
Loose or improper
Signs of overheating or corrosion
Grounding/Bonding Integrity
*
Properly grounded and bonded
Bonding/grounding missing or inadequate
Not applicable
Torque/Fastening of Termination Hardware
*
Correct torque applied
Under-torqued
Over-torqued
Sheath/Armor Condition
*
Intact and undamaged
Minor nicks or abrasions
Severe damage or missing sections
Labeling/Identification Present and Legible
*
Yes, present and legible
Partially legible or missing
Not applicable
Defects or Nonconformities Observed
Corrective Actions Taken (if any)
Final Inspection Outcome
*
Pass – No issues found
Pass – Issues corrected
Fail – Issues remain