Cable Partial Discharge Test Form
Use this form to document cable partial discharge testing details, measurements, findings, and recommended actions.
Cable and Test Identification
Cable/Asset Identifier
*
Cable or Circuit Name
*
Site / Location
*
Installation Area or Feeder
Cable Type / Construction
*
Please Select
XLPE
PILC
EPR
Single-core
Three-core
Armoured
Unarmoured
Other
Nominal Voltage Level
*
Please Select
0.6/1 kV
3.3 kV
6.6 kV
11 kV
22 kV
33 kV
66 kV
Other
Test Date and Time
*
-
Month
-
Day
Year
Date
Hour Minutes
AM
PM
AM/PM Option
Test Setup and Conditions
Tester Name
*
First Name
Last Name
Company / Department
*
Test Equipment Model or Identifier
*
Test Method / Procedure
*
Please Select
IEC 60270
IEEE 400.3
IEC 60270 with External Coupling Capacitor
Manufacturer Procedure
Other
Test Location / Setup Notes
Ambient Temperature (°C)
Partial Discharge Measurements and Findings
Test Voltage Applied (kV)
*
Measured Partial Discharge Level (pC)
*
Phase or Channel
Please Select
A
B
C
N/A
Other
Indication Level / Severity
*
Please Select
Low
Moderate
High
Critical
Test Result / Status
*
Pass
Fail
Conditional Pass
Inconclusive
Defects or Anomalies Observed
Recommended Corrective Action or Follow-up
Submit
Should be Empty: