X-Ray Installation Checklist Form
Complete each step to ensure a successful and compliant X-ray installation. Use this checklist to track progress and confirm setup completion.
Equipment Delivered and Inspected
*
X-ray unit delivered
Accessories and cables received
All items inspected for damage
Site Preparation Completed
*
Room cleared and cleaned
Floor and wall supports checked
Electrical and Power Connections Verified
*
Power supply meets specifications
All connections secured
X-Ray Machine Assembly Completed
*
Main unit assembled
Accessories attached
System Calibration and Testing
*
Calibration performed
Test exposures completed
Software and Workstation Setup
*
Software installed
Workstation configured
Radiation Shielding and Safety Features Checked
*
Shielding installed
Warning lights operational
Safety Signage and Notices Posted
*
Radiation warning signs placed
Operating instructions displayed
Operator Training Completed
*
Operators trained on equipment use
Safety protocols reviewed
Final Review and Handover
*
Installation reviewed with client
Documentation provided