HVAC Concrete Pad Checklist Form
Complete this checklist to verify all requirements for HVAC concrete pad installation are met.
Project Name or Site Location
*
Date of Inspection
*
 -
Month
 -
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Pad Dimensions (Length x Width x Thickness in inches)
*
Checklist: Pre-Pour Site Preparation
*
Site cleared and leveled
Formwork installed and secure
Compacted sub-base present
Checklist: Pad Placement & Surface
*
Pad placed at correct location
Surface smooth and free of defects
Edges finished and formwork removed
Checklist: Level and Slope Verification
*
Pad is level within tolerance
Slope (if required) is correct
Checklist: Anchors and Clearances
*
Anchors installed as specified
Required clearances maintained
Checklist: Curing and Completion
*
Pad cured for required duration
No cracks or surface defects after curing
Issues Found (if any)
Final Verification / Inspector Name
*
Submit Checklist
Should be Empty: