RF Cable Termination Checklist Form
Track each step from preparation through closeout.
Work area and materials prepared: required cable, connector, tools, and work area ready
Cable identity verified: cable type, impedance, and intended connector compatibility checked
Cable inspected: jacket, shield, and center conductor free of visible damage
Cable measured and prepared: required length confirmed and cut cleanly
Jacket stripped: dimensions match connector instructions and dielectric and shield remain undamaged
Shield prepared: braid or foil handled as required and no stray strands remain
Connector installed: components assembled in the correct order and fully seated
Termination secured: connector crimped, compressed, or tightened using the specified method and tool
Quality checks completed: termination visually inspected and cable continuity or RF performance tested using the applicable procedure
Closeout completed: test result recorded, cable labeled, and work area cleared
Submit Checklist
Should be Empty: