Stair Tower Handover Checklist Form
Record completion checks, outstanding items, and readiness for handover.
Stair tower location and identification
*
Location is clearly recorded and matches the handover area
Tower identifier or tag is present and legible
Handover record identifies the stair tower being checked
Access and approach
*
Approach route is clear and usable
Entry and exit points are accessible
No stored materials obstruct the approach or access points
Stairs, landings, and handrails
*
Stair treads are secure and visibly undamaged
Landings are stable, clear, and free of noticeable damage
Handrails are present, secure, and continuous along the stairs
Guardrails and edge protection
*
Guardrails are in place at exposed edges
Edge protection components appear secure and complete
Any missing or damaged edge protection is recorded as an outstanding item
Structural condition and stability
*
Visible tower components show no apparent damage or deformation
Tower appears stable, with no noticeable movement or leaning
Observed structural concerns are recorded for follow-up
Ties, bracing, and connections
*
Visible ties and bracing are present at the handover area
Connections appear seated and secure
Missing, loose, or damaged components are recorded for follow-up
Platforms and openings
*
Platforms are seated securely and have no visible damage
Platform surfaces are clear of loose materials
Openings are identified and have suitable covers or barriers in place
Lighting and visibility
*
Stairs and landings are sufficiently visible for the intended use
Lighting is available along the access route where needed
Dark spots or visibility concerns are recorded for follow-up
Housekeeping and removal of obstructions
*
Stairs and landings are free of debris and loose items
Access routes and exits are clear of obstructions
Unneeded materials and equipment have been removed or assigned for removal
Handover documentation, outstanding defects, and readiness status
*
Handover documentation is completed and available
Outstanding defects or actions are documented with follow-up noted
Readiness status is recorded: ready for handover
Readiness status is recorded: not ready; follow-up required
Submit Checklist
Should be Empty: