Fire Pump Commissioning Checklist Form
Record commissioning checks, test readings, and corrective actions.
Site / Project
*
Pump Identification
*
Commissioning Date
*
 -
Month
 -
Day
Year
2 digit month, 2 digit day, 4 digit year
Date
Responsible Technician
*
First Name
Last Name
Safety Readiness Acknowledgment
*
I confirm the applicable site safety procedures are in place.
Installation Checks
*
Pump and driver securely mounted
Suction and discharge piping connected and supported
Valves and fittings inspected
Coupling alignment and guards checked
Other installation check
Electrical / Control Checks
*
Power supply and connections checked
Controller indicators and settings checked
Alarms and status signals checked
Automatic and manual controls checked
Other electrical/control check
Pump Operation Checks
*
Startup and shutdown checked
Rotation direction verified
Operation observed at required test points
Abnormal noise, vibration, or leakage checked
Other operation check
Measured Test Readings
*
Deficiencies / Corrective Actions
Submit Commissioning Record