Equipment Shutdown Checklist Form
Check each item as you complete the routine equipment shutdown.
Equipment identification recorded
Equipment ID or asset identifier recorded
Shutdown date and time recorded
Shutdown date and time recorded
Responsible operator recorded
Responsible operator identified in the shutdown record
Notify affected personnel
Affected personnel notified
Follow the equipment-specific shutdown procedure
Applicable equipment-specific procedure followed
Stop equipment using normal controls
Equipment stopped using normal controls
Isolate energy sources and apply site lockout/tagout procedures where applicable
Energy sources isolated
Site lockout/tagout procedures applied where applicable
Verify a safe de-energized state
Safe de-energized state verified
Safely address stored energy and secure the equipment
Stored energy safely addressed
Equipment secured
Document completion, issues, or handoff notes
Shutdown completion documented
Unresolved issues or handoff notes documented, if any