NON CONFORMITY REPORT
NEW BMW PLANT BRAZIL 52.10
DATE
*
-
Year
-
Month
Day
Date Picker Icon
LOT/SITE
*
LOT 1
LOT 2
LOT 3
LOT 4
SITE (GENERAL)
AREA(LOCATION)
*
(L1)-Assem& Logistics
(L1)-Body Shop
(L2)-Central Admin
(L2)-Canteen
(L2)-Quality Lab.
(L2)-Paint Shop
(L2)-Body Store
(L3)-Site Installations
(L3)-Masterp./Infrast.
(L3)-Sewage System
(L3)-Storm Water System
(L3)-Roads / Pavings
(L3)-Elect. Dist.&SubStations
(L3)-Tank Farm
(L3)-Fencing/Gates/Barriers
(L3)-Exterior Lighting
(L3)-Green Areas/Landscape
(L3)-Potaple Water System
(L3)-Natural Gas System
(L3)-Telecomunication
(L3)-Parking Areas
(L3)-Test Track
(L3)-Sprinkler/Firefight Water
(L3)-FM Building
(L3)-Entrance Building
(L3)-Waste Building
(L3)-Main Substation
(L3)-Sprinkler Station
(L3)-Water Treatment Plant
(L3)-Covered Car Parking
(L3)-Truckers Room
(L3)-Cr\u00e9che / KIKA
(ENV)-Waste Center
(ENV)-Warehouse
(ENV)-Waste Water
(ENV)-Concrete Plant
Other
PROCESS (SERVICE)
*
(GEN)-Planning
(GEN)-Quality
(GEN)-Contract
(GEN)-Cost
(GEN)-Environmental
(GEN)-HSE
(GEN)-Concrete
(INF)-SITE/EARTHWORKS
(INF)-PAVING (Asfault)
(INF)-PAVING (Saibro)
(INF)-PAVING (Concrete Asfault)
(INF)-UNDERGROUDS
(INF)-LANDSCAPING/GREEN AREAS
(INF)-FENCING
(FOUNDT)-PILES
(FOUNDT)-PILE CAPS
(FOUNDT)-SWALLOW BEAMS
(FOUNDT)-GROUND BEAM
(PRECAST)-COLUMN
(PRECAST)-RECTANGULAR BEAM
(PRECAST)-Y BEAM
(PRECAST)-MAIN GUTTER
(PRECAST)-RECTANGULAR GUTTER
(PRECAST)-SLAB
(PRECAST)-FACADE
(PRECAST)-FIREWALL
(PRECAST)-WALL
(ROOF)-STEEL STRUCTURE
(ROOF)-ROOF PANEL
(ROOF)-ROOF SEAL
(ROOF)-RWDP
(ROOF)-TILE
(CLADING)-STEEL STRUCTURE
(CLADING)-PANEL
(CLADING)-TILE
(IND.FLOOR)-SOIL REINFORCEMENT
(IND.FLOOR)-SOIL PREPARATON
(IND.FLOOR)-UNDERGROUND INSTALATIONS
(IND.FLOOR)-REBAR
(IND.FLOOR)-FORM
(IND.FLOOR)-CONCRETE
(IND.FLOOR)-CURE
(IND.FLOOR)-GROVING
(IND.FLOOR)-COATINGS/PAINTINGS
(IND.FLOOR)-PITS
(CIVIL)-BRICK WALLS
(CIVIL)-DRYWALLS
(CIVIL)-MASSONRY
(CIVIL)-WALL TILING
(CIVIL)-FLOOR
(CIVIL)-FRAMEWORKS
(CIVIL)-TABLEWARE
(MEP)-ELECTRICITY
(MEP)-ILUMINATION
(MEP)-SPDA
(MEP)-POTABLE WATER
(MEP)-INDUSTRIAL WATER
(MEP)-FIREFIGHT WATER
(MEP)-DRAINAGE
(MEP)-SEWAGE
(MEP)-GAS
(MEP)-FUEL
(MEP)-COOLED WATER
(MEP)-COMPRESSED AIR
(MEP)-HVAC
(MEP)-HEATERS/HOT WATER
(MEP)-FIRE DETECTION/ALARM
(MEP)-TI
DESCRIPTION:
*
PHOTO
*
Upload a File
Do not upload very high quality pictures
Cancel
of
REFERENCE DOCUMENTS:
CONCREMAT
Fiscal Engu00ba
*
Construction Manager
*
ASS:________________________
Date:
EXECUTION PROTOCOL (PERVILLE or u00a0SUBCONTRACTOR)
EXECUTANT
*
PERVILLE
TUV
WEG
MULTIAGUA
VOGELZANGEN
MEGABARRA
MARX&BRASIL
BENTLER
DURR
Engu00ba
*
ASS:________________________
Date:
CONCREMAT ANALYSIS
Accepted
In Analysis by Contractor
In Analysis by BMW/Concremat
Rejected
SUBMIT TO QUALITY CONTROL
Clear Form
Should be Empty: