FORM SIM 1 UTILITY GD.1 - DEPT. TEKNIK
PT. TIRTA INVESTAMA KEBONCANDI
Tanggal
*
-
Day
-
Month
Year
Date
Waktu
*
Hour Minutes
Shift
*
Please Select
1
2
3
Nama Petugas
*
Nama
NIK
Back
Next
CHECKLIST SIM 1 AREA GARDU PLN
Catatan KWH Meter PLN
Nilai
LBP
BP
PF
Ur
Upload Foto Meter
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA TRANSFORMATOR 630 KVA
Gedung 1
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Ruangan
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Ruangan & Unit
Operational
A
(Tidak ada Kebocoran)
C
(Bocor)
Oli Trafo
Operational
A
(Dibawah 50 'C)
B
(50 'C)
C
(Diatas 50 'C)
Temp. Unit Trafo
Equipment
A
(Hidup)
C
(Mati)
Exhaust Ruangan
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA PANEL LVMDP
Gedung 1
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Ruangan
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Panel
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Ruangan & Unit
Equipment
A
(0.96 - 1)
B
(0.95)
C
(Dibawah 0.95)
Cos Phi >0.95
Equipment
A
(Dibawah 20%)
B
(20%)
C
(Diatas 20%)
THDi
Equipment
A
(Dibawah 5%)
B
(5%)
C
(Diatas 5%)
THDv
Equipment
A
(380 - 410)
B
(370 - 380)
C
(Dibawah 370 / Diatas 410)
Voltase Incoming
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA GENSET 591 KVA
Gedung 1
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Ruangan
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Ruangan & Unit
Operational
A
(Tidak ada Kebocoran)
C
(Bocor)
Oli / solar
Operational
A
(Penuh)
B
(Kurang)
C
(Habis)
Level Air Radiator
Operational
A
(Penuh)
B
(Kurang)
C
(Habis)
Level Oil Engine
Operational
A
(Standar)
C
(Kendor)
V-Belt Engine
Operational
A
(Standar)
C
(Kendor)
V-Belt Engine
Operational
A
(Standar)
C
(Kendor)
V-Belt Engine
Equipment
A
(Diatas 24 V)
B
(24 V)
C
(Dibawah 24 V)
Tegangan baterai
Equipment
Hours
Running Hours Genset
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA BOILER EI1000 / EH1500
Gedung 1
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Ruangan
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Panel
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Ruangan & Unit
Operational
A
(Ada)
C
(Tidak Ada)
Kebocoran steam
Operational
A
(Tidak berwarna)
B
(Putih)
C
(Hitam)
Asap Cerobong
Operational
A
(8-10 Bar)
B
(6-8 Bar)
C
(Kurang 6 / Lebih 10 Bar)
Pressure Feed Pump
Operational
A
(6-8 Bar)
B
(5 Bar)
C
(Kurang 5 / Lebih 8 Bar)
Pressure Steam
Operational
A
(0 PPM)
B
(1 PPM)
C
(>1 PPM)
Hardness Softener
Operational
A
(>50 'C)
B
(40-50 'C)
C
(Kurang 40 'C)
Temperatur Kondensat
Operational
Hours
Running Hours
Support
A
(80-100 %)
B
(50-80 %)
C
(Kurang 50 %)
Level Chemical Boiler
Support
A
(11-12)
B
(10-11)
C
(Kurang 10)
PH Air
Support
A
Normal
C
Tidak
Blow down Sistem
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA AHU LINE CAPSNAP
Operational
A
(Tertutup)
C
(Terbuka)
Man Hole AHU
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Panel
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Area & Unit
Operational
A
(Ada)
C
(Tidak ada)
Kondensasi / Kebocoran Unit
Operational
A
(5-15 Pa)
C
(Kurang 5 / >15 Pa)
Delta P PreFilter
Operational
A
(10-25 Pa)
C
(Kurang 10 / >25 Pa)
Delta P Medium Filter
Operational
A
(Bersih)
B
(Kotor)
C
(Blocking)
Filter Air Fresh
Operational
A
(Standar)
C
(Kendor)
V-Belt Blower
Operational
A
(6-15 Pa)
B
(5 Pa)
C
(Kurang 5 Pa)
Delta P Hepa/Ruang Filler
Operational
A
(20-24 'C / Dibawah 65%)
B
(>24-25 'C / 65%)
C
(>25 'C / >65%)
Temperatur & RH R.Filler
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Back
Next
CHECKLIST SIM 1 AREA CHILLER HITACHI / AICOOL
Gedung 1
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu/Pagar Ruangan
Operational
A
(Tertutup & Terkunci)
C
(Terbuka / Tidak Terkunci)
Pintu Panel
Operational
A
(Bersih & Rapi)
C
(Kotor/ Tidak Rapi)
Ruangan & Unit
Operational
A
(Ada)
C
(Tidak ada)
Kebocoran Instalasi
Operational
A
(10-12 'C)
B
(12-15 'C)
C
(>15 'C)
Water Temp. Outlet
Operational
A
(Bersih
B
(Berdebu)
C
(Blocking)
Kondensor
Suara Motor Blower
Please Select
Halus
Kasar
Suara Motor Pompa Transfer
Please Select
Halus
Kasar
Temuan
Action Plan
Status
Please Select
OPEN
CLOSE
Upload Foto Area
Browse Files
Drag and drop files here
Choose a file
Cancel
of
Submit
Should be Empty: