• Image field 53
    • Kitchen/Bath Assessment Survey 
    •  -
    •  -
    •  -
    • How did you hear about us? (Select all that apply)

    • Type of project (Select all that apply)

    • Remodel Project Assessment 
    • How long have you owned your home?
    • How long do you plan on staying in this home?
    • What about your current situation prompted you to set this appointment? (Select all that apply)

    • What do you hate about your current situation? (Select all that apply)

    • What do you love about your current situation? (Select all that apply)

    • Have you ever received a price quote on a bath/kitchen remodel
    • How long have you been contemplating this project?

    • What has stopped you from achieving these dreams? (Select all that apply)

    • Is there anything that we would need to know to about making this project urgent? (Select all that apply)

    • Who will be the primary users of this new project? (Select all that apply)

    • Have you worked with other contractors on other projects?
    • Rows
    • Interested in financing options

    • Browse Files
      Cancelof
    • Proceed to Scope of Work/Product Selection

    •  
    • Scope Of Work/Product Selection

    • Tear Out 
    • Demo complete  bathroom

    • Finished Basment

    • Plumbing accessible from below if needed

    • Browse Files
      Cancelof
    • Electrical Panel is accessible

    • Room in electrical panel for additional circuits if needed

    • Browse Files
      Cancelof
    • Lead Paint Remediation needed if the wall area to be modified was constructed before 1978 and more than 6 sq. ft.

    • Walls to be Altered or removedl

    • Demo soffit above tub/shower/sink area

    • Remove existing tub/shower module

    • Remove existing tub/shower and tile-wall surround

    • Remove toilet

    • Remove flooring

    • Remove towel bar and toilet paper holder

    • Remove vanity

    • Remove counter top

    • Remove wallpaper

    • Remove Door, Casing,base, window Trim

    • Remove heat register cover

    • Browse Files
      Cancelof
    • Shower Base Install 
    • Base Manufacture

    • Shower Base

    • Move or Convert Existing Drain to 2" Shower Drain For Left Hand Shower Pan

    • Drain Location

    • Necessary floor repair in front of the shower base will be needed

    • Browse Files
      Cancelof
    • Acrylic Shower Corner Seats 
    • Browse Files
      Cancelof
    • Acrylic Tub Liner 
    • Drain Location

    • Browse Files
      Cancelof
    • Replacement Tub 
    • Type of Tub

    • Tub Drain Location

    • Replace drum trap with PVC P-Trap

    • Install new drain kit.

    • Install new Drain & Overflow assembly.

    • Drain Trim Finish

    • Repipe to Stack.

    • Necessary floor repair in front of the tub will be needed (typically needed when no new floor is being installed)

    • Browse Files
      Cancelof
    • Shower/Tub Walls Preparation 
    • Wall repair in tub/shower area

    • Fur out walls

    • Rebuild walls

    • Build new walls

    • Repair water damage walls

    • Browse Files
      Cancelof
    • Prime Bath Smooth Wall System  
    • Standard Tub System.Consists of (1) 61" x 85" flat wall and (2) 40" x 98.5" walls with 2" bend on one of the 98.5" sides

    • A-BEND TUB SYSTEMConsists of (1) 61" x 85" with 2" bend on 61" side and (2) 36" x 98" walls that are formed with 1-1/2" bend on all four sides of panel.

    • Smooth WallsThe smooth flat walls are made of high-quality acrylic with Microban® antimicrobial protection.Bathtub (almond, biscuit, white)Soap Dish Wall - 60" x 83" (changing to 61" x 85")Side Wall - 38" x 97" (changing to 40" x 98.5")Shower (almond, biscuit, white)Soap Dish Wall - 60" x 94" (changing to 65" x 98.5")Side Wall - 38" x 97" (changing to 40" x 98.5")All other ColorsSoap Dish Wall - 66" x 105" (changing to 65" x 98.5")Side Wall - 42" x 105" (changing to 40" x 98.5")Premium colors: Usable pattern is only 60" wide on 66" x 105" panels.

    • Browse Files
      Cancelof
    • Sim tile systems look just like real tile and comes in 4x4, 8x8, 10x10 with Rosettes, 12x12 Roma, Piazza, and Subway styles. 

    • Single Panel Sim-Tile Walls
      Sim tile systems look just like real tile and comes in 4x4, 8x8, 10x10 with Rosettes, 12x12 Roma, Piazza, and Subway styles.

    • Rows
    • Browse Files
      Cancelof
    • Wainscoting with molded Chair Rail/Acrylic Baseboard Trim 
    • WAINSCOTING SEAMS
      The seam strip is designed to cover up the seam of two adjoining panels for a finished look.

    • Browse Files
      Cancelof
    • Prime Bath Trim Pieces/Options 
    • Browse Files
      Cancelof
    • Prime Bath Grab Bars 
    • Rows
    • Browse Files
      Cancelof
    • Prime Bath Wall Accessories 
    • Browse Files
      Cancelof
    • Choreograph Tub and Shower Wall Systems  
    • Image field 445
    • The Choreograph shower wall and accessory collection lets you personalize your shower with beautiful wall designs, convenient accessories and clever storage solutions. Let us take you through the selection process, detailing how you can turn your shower into a clean and organized space.

      Choreograph your shower in four steps:

      Choose your shower type and size

      Choose your wall color and design

      Choose your accessories

      Choose your joints and trim

    • Browse Files
      Cancelof
    • Kohler Shower Barres and Accessories  
    • Browse Files
      Cancelof
    • Ceramic Tile Install 
    • Rows
    • Rows
    • Browse Files
      Cancelof
    • Mudset Tile Shower Base 
    • Browse Files
      Cancelof
    • Tile Shower Seats 
    • Browse Files
      Cancelof
    • Tub and Shower Faucet  
    • Browse Files
      Cancelof
    • Shower Doors and Shower Rods 
    • Euro Series

    • Euro SeriesOptional Features

    • Browse Files
      Cancelof
    • Toilets 
    • Other Toilet Options

    • Toilet Seat Options

    • Browse Files
      Cancelof
    • Cabinets  
    • Select Items Needed

    • Browse Files
      Cancelof
    • Lav Area 
    • Lav Faucet Options
    • Faucet Manufacture

    • Faucet Finish

    • Will plumbing have to be relocated?

    • Vanity Top

    • Sink Options

    • Browse Files
      Cancelof
    • Toilet Topper 
    • Browse Files
      Cancelof
    • Heat Register 
    • Browse Files
      Cancelof
    • Flooring 
    • Browse Files
      Cancelof
    • Towel Bar / Paper Holder 
    • Browse Files
      Cancelof
    • Electrical  
    • Browse Files
      Cancelof
    • Electrical Light box and can lights  
    • Browse Files
      Cancelof
    • Electrical Exhaust Fans and venting 
    • Browse Files
      Cancelof
    • Electrical Whirlpool Tub and heaters 
    • Browse Files
      Cancelof
    • Electrical Misc Items and Permits 
    • Browse Files
      Cancelof
    • Carpentry / Drywall /Milwork / Painting 
    • Browse Files
      Cancelof
    • Water Softener / Filtration / Heating 
    • Browse Files
      Cancelof
    • Permits 
    • Browse Files
      Cancelof
    • Misc Items 
    • Browse Files
      Cancelof
    •  
    • Should be Empty: