Paving Daily Report
DATE
-
Month
-
Day
Year
Date Picker Icon
Hour Minutes
AM
PM
AM/PM Option
Project Number/Name
Technician
*
Please Select
Yovana Martinez
Jarvis Fields
Tyler Oneal
Weather
*
Please Select
Clear
Partly Cloudy
Overcast
Rain
Temperature
*
Please Select
< 32 ℉
32-50 ℉
51-70 ℉
71-90 ℉
> 90 ℉
General Contractor
Asphalt Plant Distribution
Mix Type:
Binder Course
12.5mm SP, 1.5 inches with approximately a net weight placed today of 59.51 tons placed while MT&C technician was on site.
Surface Course
9.5mm T2 SP, 2 inches with approximately a net weight placed today of 136.61 tons placed while MT&C technician was on site
Asphalt Tack Coat
Asphalt Temperature
Asphalt Contractor Equipment
One asphalt spreader, One Leeboy 8520B, Two Dual Drum Vibratory Rollers, One Hamm HD*70i and One Hamm HD*14i and One rubber tire traffic roller - Dynapac CP1200
Asphalt Rolling Pattern
2 vibratory passes and 1 static pass was established on the 12.5 mm mix. 2 vibratory passes and 1 static pass was established on the 9.5 mm mix. Note: 1 pass equals one way in one direction.
Asphalt Density Testing with Nuclear Gauge
For the 12.5 mm mi: (based on theo. spec. density of 153.6, Mix Design ID 77R-12.5SP-32-1) The uncorrected average air voids obtained was 5.9% with a density range of 144.5 pcf to 149.0 pcf. For the 9.5 mm mix: (based on theo. spec. density of 155.3, Mix Design ID 77R-9.5SP-27-1) The uncorrected average air voids obtained was 3.9% with a density range of 146.4 pcf to 149.5 pcf. Note: These readings were taken after the final pass of the finishing roller. Today's asphalt placement of the 12.5 mm SP binder mix started at 9:30 am with an air temperature of 74 Degrees Fahrenheit. Asphalt delivery remained consistent with no extended delays with unloading trucks.