• RABS-IMS-F-030 SWMS Road Resurfacing Form

  • Date
     - -
    2 digit day, 2 digit month, 4 digit year
  • Site Working on ( For Same Client TODAY)*
  • Mixed Crew
  • RABS Bobcat Milling
  • RABS Profiling
  • RABS Truck Drivers
  • WORKSITE HAZARD ID and RISK ASSESSMENT

    Complete RISK SCORE using following table for all site Hazards

    Risk Classification

    1 - Low
    Must be considered not a major issue at worksite

    2 - Medium
    Must be implemented with potential issue at worksite

    3 - High

    Must be implemented with utmost care and safety at worksite

  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Pedestrians and
    General Traffic
    Impact with passing vehicle.
    Body Bruising
    Serious Injury
    Appropriate signage and traffic control procedures will comply with applicable regulations and codes of practice to ensure safety and minimise inconvenience to traffic. Use of internal and/or external traffic control resources when and as required on going risk assessment/ visual awareness.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Power / Phone Lines OverheadSerious Injury / Fatality• Identify and locate all overhead power and telecommunications lines prior to commencing work or setting up equipment.
    • Ensure that all planned work activities remain outside the minimum approach distances specified in Energy Safe Victoria’s No Go Zones requirements.
    • If work is required within a No Go Zone, obtain the appropriate permits, authorisations, and guidance from the relevant electricity distribution company before proceeding.
    • Where potential hazards are identified, contact the electrical or telecommunications service provider to make the area safe or implement required risk‑control measures.
    • Use spotters, exclusion zones, and signage where necessary to maintain safe clearance distances.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Internal Worksite Traffic/ ReversingImpact with moving vehicle. Serious InjuryEstablish safe work zone for equipment compliance with RABS Paving P/L reversing hazard procedures, correct use of visual and hearing aids. Safety vest and reversing beepers. On going risk assessment.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Dust/ Fumes Inhalation Eye Irritation Profilers / Suction Sweepers are all factory fitted with "water spray system" as a dust repellent in addition. Operators have been issued with dust masks and glasses.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Exposure to Weather Sunburn / Heat
    Wet Weather

    Sunburn / Skin Damage Exhaustion Heat Rash

    All employees are provided with and are required to wear long pants and long sleeve shirts, hats and sunscreen. Full weather gear is also issued.
    Operators are to exercise the need to program rest breaks and prevent dehydration.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Plant Safety Fault ReportsSerious InjuryAll operators have daily plant start up and Fault Reports, which are filled out via Monday.com app. Service Manager receives report instantly via Monday.com portal. All issues are dealt with promptly.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Fire SafetyBurn / Spillage Environmental

    Each crew has been trained in fire extinguisher / blanket use and spill kits and equipped with fire extinguishers and spill kits.

    Spill kits are inspected quarterly

    Fire extinguishers are inspected twice a year.

    Burns first aid kits is kept in crew busses.

  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Manual / Plant HandlingBack Stress / Strain Muscle Soreness Serious InjuryRABS Paving Group COMPLIES with all plant shut down/ lock out tagging in reference to all major faults and safety issues. All staff are trained in safe use of equipment prior to operation. All staff hold current operator tickets.
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Site Specific Hazards Serious InjuryA tool box meeting is held daily to discuss site specific hazards and appropriate measures are put in place. All tool box / start up paperwork is completed in Monday.com daily. 
  • Task / ActivityPotential HazardLikelihood of harmControls
     

    Road Profiling
    Asphalt Paving

    Noise and Vibration Erosion & Dust Flora & FaunaNoise Nuisance for Residence, Dust Deposits
    Destroy Habitats
    Operators will review and enhance noise & vibration control measures. Crew will increase use of water spray or protect with geofab blanket. The toolbox meeting will discuss environmental issues before starting.
  • Are there any other site related risks that need to be considered before moving ahead ? (PLEASE SELECT SITE AND COMPLETE DETAILS)
  • Link to SWMS associated with the work being completed.

     

     RABS-IMS-SWMS-001-Asphalt Laying.pdf

    RABS-IMS-SWMS-002-SWMS - Cold Planning - Profiling.pdf

    RABS-IMS-SWMS-003-SWMS - On Site Plant Refilling.pdf

    RABS-IMS-SWMS-004-SWMS - Bobcat Mill Operation .pdf

    RABS-IMS-SWMS-005-SWMS - Loading Unloading.pdf

  • SWMS SIGN-OFF

    This SWMS developed in consultation and cooperation with workers and relevant organisation representatives. I have read the above SWMS, and I understand its contents.

    I confirm that I have the skills and training, including relevant certification, to conduct the task as described. I agree to comply with safety requirements within this SWMS,

    including risk control measures, safe work instructions, and PPE described.

      

     Participants in SWMS:

  • Person 1 & Company Name
  • Person 2 & Company Name
  • Person 3 & Company Name
  • Person 4 & Company Name
  • Person 5 & Company Name
  • Person 6 & Company Name
  • Person 7 & Company Name
  • Person 8 & Company Name
  • Person 9 & Company Name
  • Person 10 & Company Name
  • Person 11 & Company Name
  • Person 12 & Company Name
  • Person 13 & Company Name
  • Person 14 & Company Name
  • Person 15 & Company Name
  • Person 16 & Company Name
  • Person 17 & Company Name
  • Person 18 & Company Name
  • Person 19 & Company Name
  • Person 20 & Company Name
  • Person 21 & Company Name
  • Person 22 & Company Name
  • Person 23 & Company Name
  • Person 24 & Company Name
  • Person 25 & Company Name
  • Person 26 & Company Name
  • Person 27 & Company Name
  • Person 28 & Company Name
  • Person 29 & Company Name
  • Person 30 & Company Name
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Approved By:

    Name : Andrew Messina

    Position : HSQE Manager

    RABS GROUP

    DATE : 01/08/2023

    Document Name RABS-IMS-F-030 SWMS Road Resurfacing FormRev No: 002
     RABS-IMS-F-030 Reviewed : 04/09/2026Next Review : 04/09/2027

    This is a controlled document. Printed copies are uncontrolled.

  • Should be Empty: