Follow the Reaction Plan if any defect is found.
1. Remove them from the line/bin and determine the type of defect and responsibility
2. Take a picture of the condition.
3. Enter defects into the SAP system.
4. Stick the Non-Conformance Label on the NG material
5. Quarantine defective parts. Move them to the PQC cage where they are then taken and revised by the data entry clerk
4. Notify the Quality and Production Supervisor (Major defects, large amount).