Framing Inspection Checklist
Project Information
Customer Name:
*
Job:
*
Project Manager performing:
*
Please Select
Florence M. Bork
Jacob N. Tucker
Lynn J. Raines
Project Manager email address:
*
Please Select
projectmanager@example.com
Exterior Checklist...
Check saddles to insure for 12" extention beyond brick walls
Punch Needed
Check brick & siding elevations for proper exterior trim
Punch Needed
Check porch beams for height & width and ceilings for 2x nailers installed.
Punch Needed
Check roof lines on hip ends & gables for straight
Punch Needed
Garage Checklist...
Check for sill plate straps or anchor bolts 6' O.C max and no more than 12" from plant ends.
Punch Needed
Check that temp stair built and fastened.
Punch Needed
Check that any attic access(s) are framed per plan.
Punch Needed
Check for garage back jambs.
Punch Needed
Basement Checklist...
Check for joist bridging or center span blocking.
Punch Needed
Check for all needed bearing blocks in floor container.
Punch Needed
Check that flat 2x10 blocking installed per plan at top of joists for kitchen counter point loads
Punch Needed
Check 1st Floor joist layout (O.C. spacing, dbl joists, nailing pattern, etc.).
Punch Needed
Stairs Checklist...
Check for minimum 36" landing from stair tread nosing
Punch Needed
Check that required nailers are installed for drywall.
Punch Needed
Check that stairs are set to proper height for floor covering selections.
Punch Needed
Check to insure treads are level.
Punch Needed
First Floor Checklist...
Check that subfloor sheathing is nailed properly and spaced (6"/12" & 1/8" gap at all edge and end joints)
Punch Needed
Check for bowed/crowned studs (mark all to be repaired)
Punch Needed
**Full height & depth studs required all bearing walls. Interior non bearing walls cut and scab 2x4**
Check door & window rough openings for correct size and location. No cap nails to be within 2" of (or) inside R.O.
Punch Needed
Check for plumb and squared walls.
Punch Needed
Check that any field framed half or knee walls are framed and braced to joist.
Punch Needed
Roof Checklist...
Check all trusses for H-2.5's and connector hangers are installed with proper nails.
Punch Needed
Check all girder trusses are nailed or bolted per truss engineering specs.
Punch Needed
Check that all gable end wall trusses are strong-backed mid way & braced properly.
Punch Needed
**The strong-back 2x4 L brace needs to be mid way between top & bottom cord.
Check that required permanent bracing has been installed per truss engineering.
Punch Needed
Safety Checklist....
Check that all window & door openings are safety blocked off at 18" & 42"
Punch Needed
Check that all safety rail and boots installed properly. 2-rail on stairs, 3 rail on landings, (only 1- rail required on basement stairs).
Punch Needed
Check that any balcony walls have 2x4 "safety toe rail" installed.
Punch Needed
Check for "tie-off" anchors installed on rear roof.
Punch Needed